Superintending Engineer Lower Mettur Electric Project T N E B And Others vs R Parvathy And Others

Madras High Court|22 February, 2017
|

JUDGMENT / ORDER

IN THE HIGH COURT OF JUDICATURE AT MADRAS DATED 22.02.2017 CORAM
THE HONOURABLE DR. JUSTICE S.VIMALA
C.M.P. Nos. 5886 & 5887 of 1995 in CMA.Sr.No. 80364 of 1992
1. Superintending Engineer Lower Mettur Electric Project T.N.E.B., Erode
2. The Chairman Tamil Nadu Electricity Board Madras .. Petitioners/Appellants in both C.M.Ps.
versus
1. R.Parvathy
2. N.Hemalatha
3. Palanichamy
4. United India Insurance Co.,Ltd., Divisional Office, Erode. ..Respondent/Respondents in both C.M.Ps.
Prayer in C.M.P.No. 5886 of 1995: Petition filed to condone the delay of 425 days in re-presenting the above CMA.Sr.No. 80364 of 1992 and direct the office to take the appeal on file.
Prayer in C.M.P.No. 5887 of 1995: Petition filed to condone the delay of 94 days in re-presenting the above CMA.Sr.No. 80364 of 1992 and direct the office to take the appeal on file.
For : No appearance For Respondent : No appearance O R D E R Despite the matters being listed under the caption “For Dismissal”, there is no representation on behalf of the petitioners. It is seen that, the appeal is pending from the year 1992, and no purpose would be served in keeping these petitions pending, when no steps have been taken to get the appeal numbered. Hence, these petitions are dismissed for non-prosecution. Consequently,CMA.Sr. is rejected.
arr 22.02.2017
DR.S.VIMALA,J.
Arr C.M.P. Nos. 5886 & 5887 of 1995 in CMA.Sr.No. 80364 of 1992
22.02.2017
http://www.judis.nic.in
Disclaimer: Above Judgment displayed here are taken straight from the court; Vakilsearch has no ownership interest in, reservation over, or other connection to them.
Title

Superintending Engineer Lower Mettur Electric Project T N E B And Others vs R Parvathy And Others

Court

Madras High Court

JudgmentDate
22 February, 2017
Judges
  • S Vimala